Controlling fast-track construction method variables (time, cost and quality)
Third Author's Department
Management Department
Document Type
Research Article
Publication Title
Infrastructure Asset Management
Publication Date
6-1-2023
doi
10.1680/jinam.23.00001
First Page
103
Last Page
112
Recommended Citation
APA Citation
El-Far, M.
Kotb, M.
&
Sabry, R.
(2023). Controlling fast-track construction method variables (time, cost and quality). Infrastructure Asset Management, 10, 103–112.
10.1680/jinam.23.00001
https://fount.aucegypt.edu/faculty_journal_articles/5402
MLA Citation
El-Far, Mohamed Ehab, et al.
"Controlling fast-track construction method variables (time, cost and quality)." Infrastructure Asset Management, vol. 10, 2023, pp. 103–112.
https://fount.aucegypt.edu/faculty_journal_articles/5402