Prequalification of Egyptian construction contractors using fuzzy-AHP models
Author's Department
Construction Engineering Department
Find in your Library
https://doi.org/10.1108/ECAM-09-2011-0088
Document Type
Research Article
Publication Title
Engineering, Construction and Architectural Management
Publication Date
7-15-2013
doi
10.1108/ECAM-09-2011-0088
First Page
381
Last Page
405
Recommended Citation
APA Citation
Hosny, O.
Nassar, K.
&
Esmail, Y.
(2013). Prequalification of Egyptian construction contractors using fuzzy-AHP models. Engineering, Construction and Architectural Management, 20(4), 381–405.
10.1108/ECAM-09-2011-0088
https://fount.aucegypt.edu/faculty_journal_articles/1967
MLA Citation
Hosny, Ossama, et al.
"Prequalification of Egyptian construction contractors using fuzzy-AHP models." Engineering, Construction and Architectural Management, vol. 20,no. 4, 2013, pp. 381–405.
https://fount.aucegypt.edu/faculty_journal_articles/1967