A geno-dynamic hybrid approach for time-cost optimization of non-serial repetitive construction projects
Department
Interdisciplinary Engineering Program
Date of Award
2-1-2004
Online Submission Date
January 2003
Document Type
Thesis
Extent
203 leaves
Library of Congress Subject Heading 1
Feasibility studies.
Library of Congress Subject Heading 2
Engineering
Rights
The author retains all rights with regard to copyright. The author certifies that written permission from the owner(s) of third-party copyrighted matter included in the thesis, dissertation, paper, or record of study has been obtained. The author further certifies that IRB approval has been obtained for this thesis, or that IRB approval is not necessary for this thesis. Insofar as this thesis, dissertation, paper, or record of study is an educational record as defined in the Family Educational Rights and Privacy Act (FERPA) (20 USC 1232g), the author has granted consent to disclosure of it to anyone who requests a copy.
Recommended Citation
APA Citation
Soliman, A.
(2004).A geno-dynamic hybrid approach for time-cost optimization of non-serial repetitive construction projects [Thesis, the American University in Cairo]. AUC Knowledge Fountain.
https://fount.aucegypt.edu/retro_etds/1748
MLA Citation
Soliman, Ahmed Abdallah. A geno-dynamic hybrid approach for time-cost optimization of non-serial repetitive construction projects. 2004. American University in Cairo, Thesis. AUC Knowledge Fountain.
https://fount.aucegypt.edu/retro_etds/1748
Call Number
Thesis 2003/44
Location
mgfth