Title

Implementation of an integrated cost and schedule control system in the Egyptian construction industry

Date of Award

6-1-1996

Online Submission Date

January 1996

Document Type

Thesis

Extent

1 v. (various pagings) :

Library of Congress Subject Heading 1

Construction industry

Library of Congress Subject Heading 2

Construction industry

Rights

The author retains all rights with regard to copyright. The author certifies that written permission from the owner(s) of third-party copyrighted matter included in the thesis, dissertation, paper, or record of study has been obtained. The author further certifies that IRB approval has been obtained for this thesis, or that IRB approval is not necessary for this thesis. Insofar as this thesis, dissertation, paper, or record of study is an educational record as defined in the Family Educational Rights and Privacy Act (FERPA) (20 USC 1232g), the author has granted consent to disclosure of it to anyone who requests a copy.

Comments

Photocopy is restricted until May 1998 unless renewal of restriction has been applied for and granted.

Call Number

Thesis 1996/ 1220

Location

mgfth

Share

COinS